A milestone must identify mandatory deliverables and external dependencies with separate acceptance for each advancement decision.
Index
A schedule may show a date met while the milestone still needs customer information; completion dates and release are different.
The rule that changes the scope
A milestone must identify mandatory deliverables and external dependencies with separate acceptance for each advancement decision.
Project software can record dates; a custom module manages conditions for moving between engineering stages.
A milestone can receive conditional acceptance permitting the next stage despite a defined exception. That decision must come from its owner and remain visible rather than be inferred from a date. Include a dependency removed after scope negotiation and show who authorized the change. History can then explain why the milestone advanced without a formerly expected document instead of presenting a misleadingly complete list of requirements.
Specify operational deliverables
- Connect each milestone with the documents and decisions required for release.
- Show outstanding external dependencies even when internal files are ready.
- Keep milestone acceptance and later changes that reopen only part of review.
Test the exception before acceptance
In a hypothetical scenario, the internal design is complete but customer confirmation is missing; the milestone must display that dependency rather than appear released.
Reference for assessing scope
NN/g: writing task scenarios for usability testing