Tracking must retain item, room and correction owner while separating work performed from checking its result.
Index
A unit may have finished rooms and others awaiting corrections; labeling it only ready or pending makes handover inspection difficult.
The rule that changes the scope
Tracking must retain item, room and correction owner while separating work performed from checking its result.
A task manager covers simple lists; a custom application organizes plans, issues and unit-specific acceptance.
The list can be organized by room for inspectors and by owner for correction crews. These are two views of the same issues, not independent lists. A duplicate should be recognized and linked while retaining the later report. Define who may declare the unit ready and which exceptions remain open. The number of closed items alone does not authorize handover if a required item still lacks review.
Specify operational deliverables
- Locate every issue in its room and record the evidence that triggered it.
- Show corrections awaiting review without automatically declaring them closed.
- Keep the sequence of attempts when the same item returns to the team.
Test the exception before acceptance
In a hypothetical scenario, a correction is photographed but the inspector finds another problem; the item must retain both pieces of evidence and remain open.
Reference for assessing scope
NN/g: writing task scenarios for usability testing