An operation crossing midnight can split one shift across two reporting days. The problem grows when branches use different local times and the database receives events in a common time zone.
The design to commission
Ask the supplier to separate event instants, local times and the operating date defined by the business. Duration must not come from subtracting clock text alone. Retain each site's time-zone reference and the rule mapping events to shifts; changes require an explicit historical treatment decision. For one site, correcting an existing transformation may suffice. Data engineering becomes relevant when multiple sources apply incompatible conventions. Investigate late time entries and unsynchronized clocks. If a source supplies only a clock time without date or zone, document ambiguity instead of manufacturing precision. Reporting should support consistent operational comparison rather than automatically impose the server calendar. The responsible manager needs to approve what a shift boundary means and see which source records could not be assigned confidently.
Supplier criteria
- Preserve original instants and local references for inspection.
- Identify shifts using agreed rules, including overnight boundaries.
- Flag incomplete timestamps without silently assigning time zones.
Acceptance with an exception
In a hypothetical test, a shift starts before midnight and finishes the following day. Events on both sides must belong to one operating slice while retaining inspectable local times.